
Phase 1
A10

Central Gas Station

This area is the future Central Gas Station area of BSEZ.
Substation

This area is the future high voltage (230kv) substation area of BSEZ.
Fire Station

This area is the future Central Gas Station area of BSEZ.
This area is the future high voltage (230kv) substation area of BSEZ.